Perform a three-dimensional scan of the cable's outer diameter (with an accuracy of ± 0.05mm) to ensure that the interference fit between the inner diameter of the joint and the outer diameter of the cable is controlled at 12 ± 2%
Verify environmental adaptability: Establish an installation environment matrix (temperature gradient, vibration spectrum, chemical exposure level) according to IEC 60079 standard.
Pre assembly stage: Pre-fit the heat shrink tubing (shrink ratio 2:1) to the cable reference line position
Staged torque control:
Install a 30 ° guide angle stress relief sleeve 150mm away from the joint.
Implement layered bundling of multi-core cables (spacing ≤ 50mm)
Pressure attenuation test: Maintain pressure at 0.5MPa for 30 minutes, pressure drop ≤ 3%
Salt spray test: 96-hour test according to ASTM B117 standard
Fluorescent penetration testing: using UV-AD-7 leak detector, with a sensitivity of 10 ^ -5 mbar · L/s
Infrared thermal imaging: joint temperature difference under operating load ≤ 2.5 ℃
Establish installation parameter blockchain file: including 3D torque curve, environmental sensor data, and operator biometric features.
Adopting AR assisted assembly system: real-time projection of tolerance range (± 0.1mm), automatic warning out-of-tolerance risk.